    John Mark B.
    Participant
    Posts: 25
      August 18, 2007 at 7:41 am #3148
      Avatar photo

      In my opinion that tolerance is for vertical positioning only (profiling). Post

      Tension Institute (PTI) recommneds horizontal tolerance of tendon placement. Please

      refer to the attached sheet.

      Refer also to TR 43 (other sheet).
      [file=../../e107_files/public/1187422863_7_FT38_tr43_tolerance.pdf]1187422863_7_FT38_tr43_tolerance.pdf[/file]

      [img:width=1700&height=2338]../../e107_files/public/1187422863_7_FT38_pti_reference.jpg[/img]

      John Mark B.
      Participant
      Posts: 25
        August 13, 2007 at 10:57 am #3146
        Avatar photo

        Hello there Mr. Yaser,

        Thank you so much for the explanation.
        Keep online from time to time because we need your technical expertise in this forum.

        cheers.

        -john mark-

        John Mark B.
        Participant
        Posts: 25
          August 13, 2007 at 5:13 am #3138
          Avatar photo

          The reason behind why we are keeping 3 levels of support to PT slab is to transmit the loads from the one under construction to a level where the accumulated capacity of the casted PT slabs resists the total loads from above.

          Please refer to the attached sheets to better understand the effect of the construction/actual loads to the levels resisting the above loads.

          If the correct propping is not being adhered, the consequence might be:
          1. Collapse of the newly casted PT slab
          2. Propagation of cracks in the bottom surface of the PT slab below the newly casted one.
          3. Inducing more deflections in the PT slab below the newly casted one.

          [file=../../e107_files/public/1186981986_7_FT34_back-propping_details.pdf]1186981986_7_FT34_back-propping_details.pdf[/file]
          [file=../../e107_files/public/1186981986_7_FT34_back-propping_load_distribution.pdf]1186981986_7_FT34_back-propping_load_distribution.pdf[/file]

          John Mark B.
          Participant
          Posts: 25
            July 26, 2007 at 12:46 pm #3134
            Avatar photo

            Basing from experience, the best way to stress a double live-end anchoragewhere the other side is a pan box anchorage is to do initial stressing at the pan box end, then on final stressing stage complete 100% stressing at the edge slab end.Then do the “pick-up” at the pan box end.This process may minimize the friction losses at the pan box end.

            John Mark B.
            Participant
            Posts: 25
              July 25, 2007 at 1:36 pm #3132
              Avatar photo

              Thanks for the answer/insight.

              We did the same process in our previous project. Only, we drilled at high point locations and did grouting at the holes. A very tedious procedure.

              cheers.