-
Open
-
In one of PT slab stressed in pan box the system was 505 but the guys fixed only 405. During stressing one of the strand which has 7 ply was cutt off and only two ply remaining.In this is it possible to distribute the loads to other cables equally. The following are information
system: 505 installed at site only 405
length :10.2m
Single end
You must be logged in to reply to this topic