      July 21, 2010 at 10:47 am #3029

      Hi,

      I'm experiencing vertical cracks in unbonded post tension beams on site. I have seen this in the normal conventional design but this has happen for first time in post tensioning. I have no idea how to handle this problem.

      Need help from you guys

      John Mark B.
      Participant
      Posts: 25
        August 24, 2010 at 1:01 pm #3326
        Avatar photo

        You need to analysis the slab in “Long-term “deflection criteria with cracked deflection checking.
        Loading combination would be like that “Long-term Cracked = 1.65xSelf weight +1.65xDead load+0.88xLive Load+1.65x prestressing

        John Mark B.
        Participant
        Posts: 25
          August 24, 2010 at 1:02 pm #3327
          Avatar photo

          Slab Or Beam

          John Mark B.
          Participant
          Posts: 25
            August 25, 2010 at 10:41 am #3328
            Avatar photo

            Both Slab or beam

            Muhammad Idris
            Participant
            Posts: 17
              September 15, 2010 at 7:08 pm #3329
              Avatar photo

              PLEASE LET US KNOW THE FOLLOWING:
              1- IS THE SLAB WAS SHUTTERED WHEN YOU SAW THE CARACK OR NO.
              2- PLEASE IDENTIFY EXACTLY THE LOCATION OF THE CREACK
              3- IDENTIFY THE CRACK WIDTH AND DEPTH
              4- IS IT A SHEAR CRACK OR FLUCTURAL CARAK
              5- WHERE THE CREACK HAS OCCURED, IN THE TOP OF THE SLAB OR N THE BOTTOM OR IF IT IS A FULL DEPTH CRACK.