we face a problem in box girder structure were we have 18 tendon of 37T15 system, we completed stressing process and after that we cut the grip length and grout cap was fixed. Prior to grouting we were asked to do air worthiness of the duct but to our suprise we had only 6 passed out of 18 to sustain the air pressure of 4 bar. Is it possible to achieve air worthiness after stressing , concreting of the structure or is it compulsory to do the test. please suggest the best solution.